Year: 2019
Final Beneficiary: “Lukoil-Moldova” SRL
Location: Chisinau city
Short description:
Supply and configuration of 90kW soft starter type 3RW, manufacturer Siemens
Year: 2019
Client: “AS-ELECTRICA” SRL
Final Beneficiary: “Repromed” SRL
Location: Chisinau City
Short description:
The ATS equipment for 2 inputs and a sectionalyzer was replaced. Power switching based on automatic circuit breakers with electric drive.
Basic equipement:
Main command device – ABB;
Power equipment – IEK;
Year: 2019
Client: “Poliserv” SRL
Final Beneficiary: "Dita EstFarm" SRL
Location: Chisinau City
Short description:
Modernization works was made for for monitoring and recording temperature and humidity system (EMS) in the pharmaceutical warehouse. This system is fully compliant with GDP standards.
Basic equipment:
Temperature and humidity sensors – Siemens;
Control system – Siemens;
Year: 2019
Client: “AS-Electrica” SA
Final Beneficiary: “Orhei-Vit” SA
Location: Orhei city
Short description:
Project development, assembly and installation of soft starter control panel for 110kW in the wastewater pump station.
Basic equipment:
Soft starter – Schneider Electric;
Power equipment – Schneider Electric;
Terminals – Phoenix Contact;
Year: 2019
Beneficiary: «Südzucker Moldova» S.A
Location: Drochia city, Falesti city
Short description:
For each of the 2 sugar factories in the city of Drochia and Falesti, сomplete automation and dispatching system of the following water services equipment was developed and implemented:
- System for supplying and metering water from artesian wells;
- Plant irrigation system;
- Monitoring system in dreinage pits;
Information from control cabinets via GSM communication is transmitted to the control room. A SCADA system was developed for the management, monitoring, avertisation and archiving of data on the state of the plant's water management equipment.
Basic equipment:
Flowmeters and level sensors – Siemens;
Power and switching equipment – Siemens;
Check-valve and actuators – Tecofi;
PLC and expansion modules – Siemens;
SCADA system – Siemens;
Year: 2019
Client: “Polimer Gaz Conducte” SRL
Final Beneficiary: Public utility “Kharkivski teplovi merezhi”
Location: Kharkiv city
Short description:
Automation system are designed to control hot water pumping stations and network pumps in boiler houses (8 in total). The automation system is designed to maintain pressure in the pressure pipe of the pumping units. As execution units centrifugal pumps with 6kV electric motors are used. 6kV frequency converters are used to maintain refulation pressure. For “human-machine communication”, the HMI panel 19 ’’ is installed on the panel’s door. It is possible to work in local, distance and automatic modes
Basic equipment:
PLC and HMI panel - Siemens;
Power and switching equipment - Siemens;
Intermediate Relays & Terminals - Phoenix Contact;
Switchgears - Tekpan;
Year: 2019
Beneficiary: "Radacini Wines" SRL
Location: Cricova city
Short description:
An automated sparkling wine production control system maintains constant pressure and temperature in fermentation tanks, including controls for mixers. The system is controlled using the HMI touch screen panel 22 ’’
Basic equipment:
PLC - Schenider Electric;
HMI panel 22” – Weintek;
Power and switching equipment - Schneider Electric;
Terminals - Phoenix Contact;
Switchgears - Tekpan;
Year: 2020
Beneficiary: "ElaDum Pharma" SRL
Location: Сojusna Village
Short description:
The project consisted of installing 2 independent systems:
- Climate control systems in the factory (BMS);
- Temperature and humidity monitoring systems (EMS);
In particular, a SCADA system was developed for managing, monitoring and archiving data. This system complies with GMP standards.
Basic equipment:
Temperature and humidity – Simex;
PLC and expansion modules – Schneider Electric;
Terminals – Phoenix Contact;
Switchgear – KUB;
Year: 2020
Client: “Metro-Wash” SRL.
Location: Chisinau City
Short description:
Wiring diagrams development and switchgears assembly for self-service car wash with 4 posts
Specification:
High pressure pumps control switchgear – 2 pcs.
Self-service post control panel – 4 pcs.
Year: 2020
Client: “Piroterm-Service” SRL.
Final Beneficiary: “AUAI Gura Bicului”
Location: Gura Bicului village, Anenii Noi district
Short description:
The project was supported by the “Fondul de Dezvoltare Durabila Moldova” and includes the following:
For Nistru 6 pumping station:
- Project works
- Power switchgear for pumping unit №7 assembly with frequency converter Siemens G120X, 250kW
- Exisiting power switchgear reconstruction works for pumping unit №5 with soft starter Siemens 3RW, 250kW
- Control switchgear assembly for pumping units №5, 7
- Mounting works
- Commisioning works
For Nistru 8 pumping station:
- Exisiting power switchgear reconstruction works for pumping unit №5 with frequency converter Siemens G120X, 250kW
- Control switchgear assembly for pumping units №5
- Mounting works
- Commisioning works
Basic equipment:
Frequency converter ans soft starter - Siemens;
Power and switching equipment - Schneider Electric;
Intermediate Relays - Schneider Electric;
Terminals – Phoenix Contact;
Switchgears - Tekpan;
Year: 2021
Client: “COMBUSERVICE” SRL.
Final Beneficiary: “PETROM-MOLDOVA” SRL.
Location: Chisinau city
Short description:
Automation system for petrol disharge pumps from oil tank trucks. All technological protection equipment are included (flow sensor, pressure sensor, vibration sensor, oil truck earthing verification, etc). Project includes the following:
- Design works
- Control panel assembly
- Electrical works
- Commisioning works
Basic equipment:
Power and switching equipment - Schneider Electric
Intermediate Relays - Schneider Electric
Terminals - Phoenix Contact
Intrinsically safe equipment – Pepperl+Fuchs
Switchgears - Tekpan
Year: 2021
Final Beneficiary: “Moldmetal Trading” SRL.
Location: Iasi city, Romania
Short description:
The cabinet is designed to control 2 screw drives 22kW using soft starters, including auxiliary equipment for metarial onloading.
Year: 2022
Client: “AS-Electrica” SRL.
Final Beneficiary: “Time Hotel & SPA”
Location: Chisinau city
Short description:
Automatic load transfer system consists in 2 input feeders, section circuit breaker and diesel generator. Equipment is controlled by prgramable relay Zelio Logic. Power equipment motorized circuit breakers are used
Works description:
- Witing diagrams developing
- Software developing
- Switchgear assembly
- Commisioning works
Basic equipment:
Programable relay - Schneider Electric
Intermediate Relays – Schneider Electric
Terminals - Phoenix Contact
Switchgears - Tekpan